Mechanical Installation, Residential
Battersea 3A
PBS contributions to this landmark development consisted of Stage 4 design Validation, full BIM co-ordination, CDP and Full Mechanical infrastructure package.
PBS successfully fabricated at least one modular utility cupboard for each of the 556 apartments off-site, in addition to all the riser and plant pipework required for integration.
Phase 3A of the former Battersea Power Station development, consisted of 556no. apartments & 35+ retail units spread across three separate buildings consisting of 15 storeys along with 3 basement levels.
PBS contributed Stage 4 Design Validation, full BIM co-ordination, CDP and Full Mechanical infrastructure package.
The project featured PBS modular utility cupboards fabricated off-site, with at least one for each of the 556 apartments, in addition to all the riser and plant pipework required.
Client : Battersea Power Station development Company
Date : 2018
Value : 31m
Category : Mechanical Installation, Residential, Retail